Article
· Oct 17, 2024 2m read
ORU to MDM with large HL7 v2 messages.

I was working on a DTL but kept getting ERROR #5002... MAXSTRING errors. The problem was that most of the DTL GUI action steps only support the string data type when working with the segments. A %String has a limit of 3,641,144 characters and my OBX5.1 was 5,242,952 characters long as the example provided. Of course PACS admin stated ultra high quality up to and including 4K resolution files were needed, so we could not get the vendor to compress or reformat these files to compressed jpg or something similar.

3 7
1 209

Let's say I have an InterSystems IRIS instance with 6 Namespaces:

  • Foo1
  • Foo2
  • Foo3
  • Foo4
  • Foo5
  • Bar

And the number of Foo# namespaces can increase at any time for a number of reasons. I need to ensure that they all have identical configuration globals stored in a DB called CONFIG, so I do the following in my configuration file:

[Map.%ALL]
Global_SYS=%DEFAULTDB
Global_SYS("CommonConfig")=CONFIG
Global_SYS("CommonOtherSettings")=CONFIG
Global_SourceControl=CONFIG

1 9
0 272

Like many others probably find themselves, we were stuck doing live data mapping in our Interface Engine that we really didn't want to do, but had no good alternative choice. We want to only keep mappings for as long as possibly needed and then purge expired rows based upon a TTL value. We actually had 4 use cases for it ourselves before we built this. Use cases:

1 0
0 77